Section 4 - In Roof Frame Installation
Preparation
The following is the area space required by a set of in roof panels, please ensure you have this area
available to you before attempting installation of your equipment.
Note: Additional materials and tools necessary and not included in the equipment supplied:
Minimum of 3 battens in the same size as the ones used in the roof, it can be possible to use
battens from the area under where the collector will be mounted.
Wood Screws 4 x 80 to x the battens to the roof.
Battery drill with 2.5mm HSS drill bit, hammer, measuring tape, wood saw, grinder with stone
blade, plumbers tools, ladder, and rope with lashings.
2615m m
mm0162
3700m m
4785m m
5870m m
5870m m
6955m m
8040m m
9125m m
mm0162
mm0162
mm0162
mm0162