RM Solar S Class 20 Pro Bedienerhandbuch Seite 44

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 88
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 43
43
Section 4 - In Roof Frame Installation
Mounting Top Angled Timber Wedge
Place top timber wedge (9) under each collector, align them and secure each with 2 screws 5x110
(24). Connect collector connections as shown in the collector installation manual. Make sure to do a
quick A = B measurements on the panels to ensure they are square.
NOTE: Pressure test the panels and insert temperature sensor into R/H panel. The panels should
be pressure tested to 6.5 bar using either compressed air, or glycol, DO NOT USE WATER. If using
glycol cover the panels for the duration of the test.
9
24
A
B
Seitenansicht 43
1 2 ... 39 40 41 42 43 44 45 46 47 48 49 ... 87 88

Kommentare zu diesen Handbüchern

Keine Kommentare