RM Solar S Class 20 Bedienerhandbuch Seite 27

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 68
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 26
27 28
6.3.6 Fit the support pipe to the top shark tails. The shark tail must be upright. Then t the
shark tails and support pipe together with U-Bolts.
6.3.7 After you placed the L – rails into position, t the Z – rails on the L – rail. Do not
tighten bolts fully. Cross measure along the diagonals and check that they are equal.
Once you are satised that each diagonal (A and B on the drawing) are equal,
tighten fully.
Seitenansicht 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 67 68

Kommentare zu diesen Handbüchern

Keine Kommentare